Our JBXF track roller bolts set a new standard in the industry with their specially developed alloy material. This advanced material provides exceptional strength, high-level toughness, and outstanding resistance to wear and fatigue.
Engineered to endure extreme pressures and vibrations, our bolts maintain integrity in all terrains - from soft, muddy wetland construction sites to rugged, rocky mountainous mining areas. This results in significantly extended service life, reducing replacement frequency and saving customers both time and money.
Bulldozer: D20, D30, D31, D37, D40, D41, D45, D50, D60
Bulldozer: D65, D68, D75, D80, D85, D150, D155, D275, D355
Komatsu: PC30, PC40, PC45, PC60, PC75, PC100, PC120, PC150, PC200
Caterpillar: E70B, E110, E120B, E215, E235, E307, E311, E312, E322
Hitachi: EX30, EX40, EX60, EX100, EX120, EX200, EX220, EX270, EX300
Volvo: EC55, EC130, EC150, EC200, EC210, EC240, EC290, EC360
Hyundai: R60, R130, R200, R210, R220, R290, R320, R914
Kobelco: SK40, SK60, SK100, SK120, SK200, SK220, SK04-2, SK07
JCB: JS70, JS75, JS110, JS130, JS160, JS180, JS200, JS220
Sumitomo: SH70, SH100, SH120, SH160, SH200, SH260, SH265, SH280, SH300
What is the brand name of the roller bolt product?
The brand name of the roller bolt product is JBXF.
Where is the roller bolt product made?
The roller bolt product is made in China.
Is the roller bolt product certified?
Yes, the roller bolt product is certified with CE and ISO.
What is the minimum order quantity?
The minimum order quantity is 5000-10000 pieces.
What is the price per piece?
The price is $0.50 per piece.
What are the packaging options?
Packaging options include 10000 pieces in a carton, bag, or pallet.
What is the delivery time?
Delivery time is 7-15 working days.
What are the payment terms?
Payment terms are TT (Telegraphic Transfer).
What is the daily production capacity?
The supply ability is 10000 pieces per day.